• Products

    Safety, Efficiency, and Aesthetics

    Contact Us

CANOPY TYPES


Long Span Canopy


  • More kilowatts per acre
  • East/West configuration option
  • Full coverage canopy
  • For parking lots

Technical Specifications

  • Length: 100′-126′
  • Width: 18′-24′
  • Max Height: 16′-25′ to top of modules
  • Clearance (min/max): 8’2″-16′
  • Span Between Foundations: 50′-65′
  • Cantilever: 10′-30′
  • DC Capacity: varies by module
  • Wind Load Capacity: designed and tested for 150 mph winds
  • Snow Load Capacity: design and tested for 60 psf snow
  • Standard steel coating: G90

Double Cantilever


  • Fewer foundations
  • Higher system capacity
  • Superior strength
  • For parking lots

Technical Specifications

  • Length: 60′-133′
  • Width: 42′-49′
  • Max Height: 25′ to top of modules
  • Standard Clearance: 13’6″
  • Span Between Foundations: 40′
  • Cantilever: N/A
  • DC Capacity: varies by module
  • Wind Load Capacity: designed and tested for 150 mph winds
  • Snow Load Capacity: design and tested for 60 psf snow
  • Standard steel coating: G90

Parking Garage Canopy


  • Lightweight material
  • Efficient installation
  • East/West configuration option
  • For parking garages

Technical Specifications

  • Length: 60′-126′
  • Width: 18′-24′
  • Max Height: 25′ to top of modules
  • Span Between Foundations: 50′-65′
  • DC Capacity: varies by module
  • Wind Load Capacity: designed and tested for 150 mph winds
  • Snow Load Capacity: design and tested for 60 psf snow
  • Standard steel coating: G90
Fast Park

Fast Park


  • 2-day installation
  • For small commercial
  • L-design unit
  • Modular canopy unit

Technical Specifications

  • Length: 45′
  • Width: 25′
  • Max Clearance: 13.5′
  • Standard Clearance: 13’6″
  • Span Between Foundations: 45′
  • Module Count: 36
  • DC Nameplate: 21.24kW
  • Panels Q.Cells Q.Peak Duo XL – G11S-590W
  • Inverter CPS 25K (or comparable)
Background

90%

GROUND-LEVEL CONSTRUCTION

Ground-based construction reduces installation time on projects and increases the safety of all employees through a significant reduction of at-height work. 100% of DC electrical work is completed on the ground, including inverter mounting, wiring up to the AC output of the inverters and underside lighting. After assembly on the ground, the canopy is lifted into place and secured to the foundations. Mechanical installation is completed at this point.

MAKE A STATEMENT WITH YOUR SOLAR CANOPY.

Contact Us